Week in Review

Week of February 16, 2026

113commitsGit Commits
14PRsPull Requests
18.8kLOCLines of Code
59.7ksteps
6workouts
6.4hr avg sleep
Girl Talktop artist
712viewslem.fyi Page Views

The week ended with this entry, which is fitting since I spent half of it building the system that generates it.

Table of Contents

What I built

lem-fyi got its journal pipeline. Issue #1 (Blog MVP) closed after 20 PRs. The markdown build runs on Cloudflare Pages, pulls weekly data from GitHub/Spotify/YouTube/Analytics, feeds it to Claude, and outputs entries like this one. I redesigned the theme toggle (#21), fixed the TOC (#18), and added RSS/Atom feeds (#14). The site went from static placeholder to functional blog in 10 commits and 12,872 lines.

darkly-suite hit two milestones: Chrome Web Store compliance audit and OAuth-gated Stripe checkout. The compliance work (#304, #113) meant scrubbing host permissions, rewriting privacy forms to avoid ======= (pre-commit hook saw them as merge conflicts), and testing distribution flows with placeholder extension IDs. The checkout flow (#402, #411, #416) requires Google OAuth before payment so Stripe can prefill the customer's email. Chrome Identity isn't available in content scripts, so the subscribe page generates throwaway tokens instead of using the extension's token. I chose prefill over lock after weighing tradeoffs - standard SaaS pattern, lets users edit if needed.

Admin tooling improved: membership sorting by email and sign-up date (#445), email notifications via Resend for business events (#397, #409), and endpoint cleanup (#443). The status endpoint no longer falls back to email lookup - token + product + status is enough. Lifetime licenses correctly show stripe_subscription_id as NULL since one-time payments don't create subscriptions.

Multi-agent sessions landed 9 milestones across darkly-suite and lem-fyi. One gotcha: branch name collision between agents on issue #300 required renaming to 302-docs-distribution-test. Another: landing-suite has local copies of FAQ/Footer/Pricing alongside @darkly/landing-shared versions - both needed updates but grep only caught shared ones initially.

lem-photo got minor about page edits (#1068, #1066). Two commits, twelve lines changed.

59-day commit streak still going. 100 commits to darkly-suite this week.

What I consumed

Girl Talk topped the week - plunderphonics for deep focus during the compliance audit. The Durutti Column and The Who rounded out the rock mood. Aleksi Perälä's IDM came in when I needed to shift gears from OAuth debugging.

Watched a magnetic induction water heater build (Greenhill Forge) and an island floor installation (Islestead). Both scratched the same itch: people making physical things with their hands while I push pixels.

How I moved

59,675 steps for the week - 13,740 on Sunday alone. Six workouts: two strength sessions, an elliptical day, and three shorter sessions including a sauna. Sleep averaged 6.4 hours with a resting heart rate of 52. Not my best sleep week - two nights didn't register - but the consistency held.

Reach

712 page views across all sites. lem.fyi's AI-enabled SWE system post pulled 78 views. darklysuite.com got 438 views, mostly landing page and admin dashboard traffic. lem.photo stayed quiet at 54 views, mostly API endpoints.

Closing

This was a week of systems. The journal pipeline writes itself now. The OAuth checkout flow handles real money. The compliance audit clears the path to Chrome Web Store publication. All infrastructure work - the kind that compounds.

Enjoy this post?

Consider leaving a small donation to support the blog.

$